Kensal Gasworks: Fears of toxic dust from 180 lorries a day
Campaigners warn of health risks from contaminated soil removal as thousands of homes are planned for the former industrial site.
Campaigners are raising alarms over potential health risks from airborne toxic waste as the Kensal Gasworks site undergoes a major redevelopment. The former industrial land, located on the border of Kensington and Chelsea and Brent, is slated for thousands of new homes, prompting fears that the removal of contaminated soil could impact residents on both sides of the borough boundary.
Concerns over soil transport and air quality
The Kensal Gasworks site is earmarked for two significant housing developments: Ballymore plans to build 2,519 homes, and St William will deliver 775 homes. Jude Allen, from the Keep Kensal Green campaign, expressed concerns to Brent Council that the process of excavating and transporting contaminated soil could release toxic gas and dust into the air. She stated that as many as 180 lorries a day might be involved in this transport for up to 12 years. Allen drew parallels with the Corby scandal, where the movement of contaminated materials through the town led to health issues.
Allen explained that the site, which produced gas and coal for over a century, has industrial chemicals including benzene, coal tar, heavy metals, asbestos, and cyanide buried underground. While developers are legally required to remediate the land, she warned that digging up contaminated soil can release hazardous substances. "On a windy day, airborne gas and dust will be carried onto the street, polluting our air, our gardens, our school playgrounds, and even through the windows of our homes," Allen told Brent Council. She highlighted that children, pregnant women, older people, and those with respiratory conditions are particularly vulnerable.
Cross-borough concerns and council responses
Queen's Park ward councillor Barbara Want reported that many Brent residents living close to the site are alarmed, with some considering moving. She noted that residents living approximately 150 metres from the site do not receive the same protective measures as site workers. Campaigners have called for measures such as an air-pressure tent and air-monitoring stations, which they feel have been ignored.
A spokesperson for Brent Council confirmed that the Kensal Gasworks site is not within Brent but acknowledged awareness of the concerns. Councillor Matt Kelcher, Cabinet Member for Regeneration and Planning, is writing to Kensington and Chelsea Council to relay these concerns and seek assurances for Brent residents. The council stated that the transportation and handling of waste are subject to environmental regulations.
Kensington and Chelsea Council's assurances
A spokesperson for Kensington and Chelsea Council acknowledged the residents' concerns about health, safety, and wellbeing. The council stated that conditions have been imposed as part of the planning process to protect residents and manage potential environmental and health impacts. These conditions include further investigation of land contamination, measures to control dust and emissions, and environmental monitoring before and during construction. Details will be reviewed with technical experts and published online.
Ballymore, in a statement to the Local Democracy Reporting Service, outlined the benefits of their development, including 2,519 homes, 500 of which will be affordable, along with public parks and biodiversity improvements. Berkeley Group was also approached for comment.
Questions this report answers
01What are the main concerns about the Kensal Gasworks redevelopment?
Campaigners fear that the excavation and transport of contaminated soil from the Kensal Gasworks site could release toxic gas and dust into the air. They are concerned about potential health impacts on residents living nearby, drawing parallels with the Corby scandal.
02How many lorries could be involved and for how long?
Jude Allen of Keep Kensal Green stated that up to 180 lorries a day could be involved in transporting contaminated soil. This process could continue for as long as 12 years as part of the redevelopment.
03What is Brent Council doing about the concerns?
Brent Council is aware of the concerns raised by its residents and councillors. Councillor Matt Kelcher is writing to Kensington and Chelsea Council to formally raise these issues and seek assurances on behalf of the Brent residents affected.
04What measures has Kensington and Chelsea Council put in place?
Kensington and Chelsea Council has imposed conditions on the development to protect residents and manage potential environmental and health impacts. These include further land contamination investigations, dust and emission controls, and environmental monitoring before and during construction.
Support is available without a police report
Find London services, specialist support and the rights set out in the Victims’ Code. If someone is in immediate danger, call 999.
Find victim supportSend a correction or case update
If a hearing, charge or outcome has changed, send the court, case number and source document so we can update the record.
Contact the desk