Kingston Market Revival Plans Recommended for Approval After Fire
Council officers back proposals to rebuild stalls and revamp historic Market House following October blaze.
Incident → evidence → outcomeProposals to revitalise Kingston Ancient Market, including the installation of new stalls and the refurbishment of the Grade II* listed Market House, have been recommended for approval by council planning officers. The plans aim to transform the historic market square into a vibrant hub for the 21st century.
The market suffered significant damage in the early hours of October 6 when a fire ripped through Kingston Market Place. The London Fire Brigade stated the blaze was accidental, likely started by a faulty fridge. The fire destroyed several market stalls and damaged the frontages of neighbouring businesses, though no injuries were reported.
Market Rebuilding and Revitalisation
Operator Between the Bridges, which took over management of the market in April last year, had already submitted plans for transformation before the fire. These plans include replacing existing stalls, improving layout for better flow, and installing new public toilets, seating, and shaded areas. A central piazza will be created by moving the existing statue to the edge of Market Square, providing space for up to 45 stalls for pop-up and themed events. A roof terrace with additional seating is also part of the proposal.
A significant aspect of the proposed redevelopment involves bringing the largely vacant Market House back into use. The Grade II* listed building would be revamped to house a restaurant and café on the ground floor, with a bar and events space on the first floor. Council officers stated in a report that the proposal would deliver a refurbished Market Square with purpose-built stalls and bring the Market House back into use, revitalising a crucial focal point of Kingston town centre.
Temporary Measures and Future Decisions
Following the fire, stalls not affected by the blaze began reopening on October 19. Temporary replacement stalls were erected on November 24 to enable businesses that lost their trading spaces to resume operations. The market, which dates back to at least 1170, is typically home to 28 permanent stalls.
Council officers have recommended Between the Bridges' transformation plans for approval. Kingston's planning committee is scheduled to make the final decision on December 2.
Questions this report answers
01What happened at Kingston Market?
A fire occurred in the early hours of October 6, destroying several market stalls and damaging neighbouring businesses. The London Fire Brigade determined the fire was accidental, likely caused by a faulty fridge.
02What are the plans for Kingston Market?
Plans recommended for approval include transforming the market with new stalls, a central piazza, and a roof terrace. The Grade II* listed Market House will also be revamped to include a restaurant, bar, and events space.
03When will a decision be made on the market's future?
Kingston's planning committee is expected to make a final decision on the proposed transformation plans on December 2.
Support is available without a police report
Find London services, specialist support and the rights set out in the Victims’ Code. If someone is in immediate danger, call 999.
Find victim supportSend a correction or case update
If a hearing, charge or outcome has changed, send the court, case number and source document so we can update the record.
Contact the desk